We're excited to share we are making progress on our Wishaven Restroom.

What We've Done
Progress Updates
-
December 2020
-
-
July 2020
-
July 21, 2020 Update
We are excited to announce that the first cabin door in! Door handles arriving next week. Please check back on our blog frequently for updates.
July 7, 2020 Update
Greetings GSSGC,We are excited to share the photos above on Skyland progress. As of now the photos reflect the following:
- Main Restroom – plumbing progress
- Directional Signs – the signs need a bit of fine tuning (adjusting for level/parallel) and old signage removed and saved for display
Work continues on:
- Wishaven Cabins – electrical is completed and the doors should be in next week. I will provide pictures when everything is completed.
-
Sleeping Cabins – gable end panels have been installed, metal
flashing on the top of the walls are partially installed. Looking
toward final painting at the end of next week.
-
May 2020
-
May 22, 2020 Update: Wishaven Cabins
Inspections by the County of Riverside continue to be approved. Siding has begun.
May 14, 2020 Update:
It’s been a busy week of work on the Wishaven cabins so far this week:
- Accessible parking place and walkway from biffy to cabin 1 was poured and finished
- All windows have been installed and cabins have vapor barrier applied
- Interior wiring is in process
May 9, 2020 Update:
- Work on Wishaven cabins and sleeping porch.
- Progress on shear panel, 80% completed.
- Panel, inverters and switch gear installed.
-
May 2019
-
May 3, 2019 Update: Skyland Main Restroom
-
February 2019
-
February 8, 2019 Update:
Although Mother-Nature slowed progress a bit, we are back to work this week on the beautiful Skyland Ranch Camp. Please see pictures below for updates.
-
January 2019
-
January 25, 2019 Updates: Main Restroom Update
Some of the walkways have been poured. Inspection on floor plumbing early next week. More concrete next week. Roof framing to start next week.
January 14, 2019 Update:
Work continues on Skyland Ranch Camp. Wall grout, filling the walls with concrete will occur Monday before the snow flies. We are excited about the progress.
January 4, 2019 Update:
Skyland Main Restroom Progress